Tilles Building #2

A recent project in which CMI provided a unitized pre-glazed curtainwall to enclose the building much faster than a traditional “stick” system. To avoid coordination issues, CMI installed the embed anchors before the concrete pours, thus assuring their correct placement. The fact that there was not one mis-located insert meant a smooth and efficient installation of the curtainwall panels and a remarkably fast “close-up” of the building. This in turn allowed interior trades to start sooner so that the owner could bring tenants into the building.



JFK Air Train Elevator Enclosures
The challenge of stainless steel and glass elevator enclosures is coordination...